September 2016

After the successful commissioning in September 2016 the first scientific tests are being conducted.
In Germany it is necessary to apply respectively qualify the plant for entry into the balancing service market. The application is submitted to the transmission network operator and is currently in progress.

September 2016

The construction phase in time-lapse

08 September 2016

First guided tour

Group photo of the first guided tour by Dr. Christian Folke in the context of the event

08 September 2016

Start of Operation

‘Start of Operation’ from representatives of all project partners (from left to right: Prof. Ernst Schmachtenberg, RWTH Aachen; Volker Wachenfeld, SMA; Dr. Rainer Bußar, Exide; Prof. Dirk Uwe Sauer, ERC; Eckhardt Rümmler, Uniper; Prof. Rik W. De Doncker, ERC)

Exterior view

Up to date exterior view of M5BAT building

Interior view

Floor view after reconstruction

Medium voltage cabinets

Medium voltage cabinets – start of operation

Room 0.11 Transformers

Complete installation of all 5 transformers

1st floor Room 1.09

Complete installation of closed VRLA batteries from GNB/Exide

June 2016

07 June 2016

Handing over of ‘Climate Pioneer’ certification

from KlimaExpo.NRW

1st floor Room 1.09.

Assembly of closed VRLA batteries from GNB successfully finished

Transformers

All 5 transformers ready positioned

Room 0.10

Medium voltage cabinets during assembly

May 2016

09 May 2016

Exide OCSM-Batteries

Ready positioned OCSM batteries in room 0.13

HVAC-Room 1st floor

Cold Water manifold for cooling battery rooms

0.11 Transformers

Transfer of 3.5 t heavy transformer

April 2016

05 April 2016

External view

New facade of building

February 2016

26 February 2016

Battery Room 0.08

Li-Ion Batteries ready for cabeling – Back view

Battery Room 0.08
Assembled Li-Ion Batteries in Room 0.08 – Front view

January 2016

26 Januar 2016

View into the corridor of the 1st floor

New windows are placed, plasterwork is finished and parts of the ventilation and air-conditioning system are already installed.

South view of the building
Exterior view has an advanced state and roof system for the ventilation and air-conditioning system are already installed.

Rooftop
Installation of heating and ventilation components on the rooftop

Rooftop view
On this picture can be seen the substructure for battery containers and the roof system of ventilation and air-conditioning.

November 2015

12 November 2015

South view of the building.

The outside wall is already newly designed for future use.

View into the Heating Ventilation and Air Conditioning (HVAC) room on 1st floor.
The air conditioning will be installed here for cooling the battery rooms.

October 2015

6 October 2015

Future converter and transformer rooms in shell condition

Lead-acid and lithium-ion battery rooms on upper floor in shell condition

August 2015

4 August 2015

View of future battery storage building from the south at the start of construction works

The building site has been set up and the site fence is visible in the foreground.

View of building from the west, with assembly area

April 2015

20 April 2015

View of future battery storage building from the south. Former office building with rows of windows and corrugated sheet facade prior to rebuild.

To accommodate the batteries and other components the windows will be clad and the building structurally reinforced as part of the rebuild./span>

Detailed view of entrance area of office building, Hüttenstraße 9, Aachen
Several additional openings will be created in the building front to provide access for the batteries, inverters, medium-voltage transformers and other components.

Existing corridor in top floor before rebuild
The basic floor plan of the building will remain. Only the rooms will be modified to accommodate the batteries; the interiors will be removed and replaced by strong floor coverings etc.

Inverter room before rebuild
The existing raised floor will be used to integrate the electricals and cabling for the inverters and medium-voltage transformers to be installed here.

Lithium-ion battery room before rebuild
The lithium-ion battery rooms will be fitted out according to a specially developed safety concept to guarantee safe operation at all times.

Building services room before rebuild
The building services equipment includes in particular the heating, air conditioning and ventilation technology components. A total of around 400 kW of cooling capacity will be installed.

Lead battery room before rebuild
Extensive ventilation technology will be installed in the lead battery rooms.

View of existing office building from the south before rebuild
As part of the rebuild the facade will be given an attractive new look.

Adjacent STAWAG (public utility) grounds with view of transformer building
The battery storage system will be connected to the substation via a dedicated 10 kV feeder.